Uganda: Selected Issues

· International Monetary Fund
電子書
87
頁數
評分和評論未經驗證 瞭解詳情

關於這本電子書

This Selected Issues paper describes Uganda’s experience under the 2013 Policy Support Instrument (PSI). The current 2013 PSI was approved by the IMF’s Executive Board in June 2013 with an initial duration of three years. Overall, performance under this PSI has been assessed to be satisfactory. Most quantitative assessment criteria were met, and macroeconomic stability maintained. However, the pace of structural reforms slowed down compared with the past, and only about half of the structural benchmarks were ultimately met. The experience shows the importance of ensuring commitment to the reforms, explaining them better, and getting broad-based buy-in to achieve progress.

為這本電子書評分

請分享你的寶貴意見。

閱讀資訊

智能手機和平板電腦
請安裝 Android 版iPad/iPhone 版「Google Play 圖書」應用程式。這個應用程式會自動與你的帳戶保持同步,讓你隨時隨地上網或離線閱讀。
手提電腦和電腦
你可以使用電腦的網絡瀏覽器聆聽在 Google Play 上購買的有聲書。
電子書閱讀器及其他裝置
如要在 Kobo 等電子墨水裝置上閱覽書籍,你需要下載檔案並傳輸到你的裝置。請按照說明中心的詳細指示,將檔案傳輸到支援的電子書閱讀器。