Construction Delays: Understanding Them Clearly, Analyzing Them Correctly, Edition 2

· Butterworth-Heinemann
3.2
5 review
E-book
288
Mga Page
Kwalipikado
Hindi na-verify ang mga rating at review  Matuto Pa

Tungkol sa ebook na ito

Delays in construction projects are frequently expensive, since there is usually a construction loan involved which charges interest, management staff dedicated to the project whose costs are time dependent, and ongoing inflation in wage and material prices. Many techniques are used to analyze delays. Some of these methods have inherent weaknesses and should be avoided. This book points out the shortcomings of these faulty methods and explains how a delay analysis should be performed. It then describes specifically how the analysis is done with CPM schedules. A explanation of delays and delay damages, presented in a straightforward, accessible manner, should be useful to public and private owners, construction managers, general contractors, subcontractors, designers, suppliers, and attorneys whose work involves them in the construction industry. The discussion will include subtleties of the process, such as shifts in the critical path, and non-critical delays. The subject of damages is covered in detail, including the major categories of extended field overhead and unabsorbed home office overhead. Likewise, the damages suffered by the owner, either actual or liquidated, are also explained. Finally, a chapter is devoted to managing the risk of delays and time extensions from the viewpoints of the various parties to a construction project. A discussion of early completion schedules and constructive acceleration is also included. In this new ediion, all chapters are updated to reflect the changes in the construction field since the first edition published over l6 years ago. The Second Edition includes over 40% more information such as new methods for analyzing delays with examples of the proper approach. The author also includes a new chapter on risk managment which focuses on the delay-related risks of the various parties in a construction project. - Explains the different categories of delays - Addresses the concept of concurrency and also non-critical delays - Discusses the more common approaches used for measuring and analyzing delays and the strengths and weaknesses associated with them - Prevention of Time-Related Delay Problems

Mga rating at review

3.2
5 review

Tungkol sa may-akda

A nationally recognized construction expert in scheduling, construction management, cost overruns/damages, construction means and methods, and delay and inefficiency analysis, Ted has either managed construction or evaluated problems on virtually every type of project including transportation, water/wastewater treatment, power, process and manufacturing, medical, educational, commercial, correctional, hotels, condominiums, residential housing, and athletic facilities.

I-rate ang e-book na ito

Ipalaam sa amin ang iyong opinyon.

Impormasyon sa pagbabasa

Mga smartphone at tablet
I-install ang Google Play Books app para sa Android at iPad/iPhone. Awtomatiko itong nagsi-sync sa account mo at nagbibigay-daan sa iyong magbasa online o offline nasaan ka man.
Mga laptop at computer
Maaari kang makinig sa mga audiobook na binili sa Google Play gamit ang web browser ng iyong computer.
Mga eReader at iba pang mga device
Para magbasa tungkol sa mga e-ink device gaya ng mga Kobo eReader, kakailanganin mong mag-download ng file at ilipat ito sa iyong device. Sundin ang mga detalyadong tagubilin sa Help Center para mailipat ang mga file sa mga sinusuportahang eReader.