Basics Terminplanung

· Birkhäuser
Rafbók
83
Síður
Einkunnir og umsagnir eru ekki staðfestar  Nánar

Um þessa rafbók

In a world of tight time frames and highly interdependent processes, scheduling is an indispensable prerequisite for successful project implementation. It is the duty of the architect to manage all the project participants in a goal-oriented manner and to call for their results when the time is right. For this reason, a systematic schedule of target dates, adapted to a project’s sequences and workflows, is a necessary tool for the day-to-day management and monitoring of complex construction projects.

Topics:
  • Organizing the planning and construction process
  • The basics of scheduling
  • Goal-oriented presentation formats and levels of detail
  • Developing a schedule
  • Using schedules in the real world

Um höfundinn

Dr.-Ing. Bert Bielefeld ist praktizierender Architekt und Inhaber des Architekturbüros bertbielefeld architekten (www.bertbielefeld-architekten.de). Er hat in der Bauleitung und Projektsteuerung Erfahrungen mit der Koordination aller Planungs- und Baubeteiligten gesammelt. Darüber hinaus ist er als Vertretungsprofessor für Bauökonomie und Baumanagement an der Universität Siegen tätig.

Gefa þessari rafbók einkunn.

Segðu okkur hvað þér finnst.

Upplýsingar um lestur

Snjallsímar og spjaldtölvur
Settu upp forritið Google Play Books fyrir Android og iPad/iPhone. Það samstillist sjálfkrafa við reikninginn þinn og gerir þér kleift að lesa með eða án nettengingar hvar sem þú ert.
Fartölvur og tölvur
Hægt er að hlusta á hljóðbækur sem keyptar eru í Google Play í vafranum í tölvunni.
Lesbretti og önnur tæki
Til að lesa af lesbrettum eins og Kobo-lesbrettum þarftu að hlaða niður skrá og flytja hana yfir í tækið þitt. Fylgdu nákvæmum leiðbeiningum hjálparmiðstöðvar til að flytja skrár yfir í studd lesbretti.